2008 Q4 - Starting Out

2009 Q1 - Beam Shelves

2009 Q2 - Stern

2009 Q3 - Stern, Hog

2009 Q4 - Stern

2010 Q1 - Frames & Ribs

2010 Q2 - Frames & Ribs, Afterdeck

2010 Q3 - Hull, Afterdeck

2010 Q4 - Floors, Cabin Sides


2011 Q1 - Bilges, Engine Room

2011 Q2 - Deck Beams, Ports

2011 Q3 - Deck Beams, Cabin Aft

2011 Q4 - Maindeck

2012 Q1 - Maindeck, Foredeck

2012 Q2 - Foredeck, Electrics

FRAME REPAIRS

The point of maximum demolition. This gives some idea of just how much of the stern had to be rebuilt. New frames going in, each of which is a very complicated three dimensional shape that has to be a good fit.

stern repairs

-

Repairs to the beam shelves, frames, and planking continue.

frame repairsshelf repairs

stern repairsstern repairs

 

These frames were a particular problem to get at.

frame repairsstern repairs

 

Measurement.

stern repairsstern repairs

 

Wrought iron frames replaced/repaired, new fastenings

iron framesiron frames

 

HOG REPAIRS

A major section of the pitch pine hog was in bad condition. It was encased in wrought iron frames that couldn't be removed. So the decision was to make a replacement in two halves, slide them in and fasten. Dense oily iroko again.

hoghog

hog repairhog repair

hog repairstern