GLALA

2011 - THIRD QUARTER

INTRODUCTION

2008 Q4 - Starting Out

2009 Q1 - Beam Shelves

2009 Q2 - Stern

2009 Q3 - Stern, Hog

2009 Q4 - Stern

2010 Q1 - Frames & Ribs

2010 Q2 - Frames & Ribs, Afterdeck

2010 Q3 - Hull, Afterdeck

2010 Q4 - Floors, Cabin Sides


2011 Q1 - Bilges, Engine Room

2011 Q2 - Deck Beams, Ports

2011 Q3 - Deck Beams, Cabin Aft

2011 Q4 - Maindeck

2012 Q1 - Maindeck, Foredeck

2012 Q2 - Foredeck, Electrics

SUMMER

cover off

 

CABIN SIDES

The after end of the cabin structure is built the same way as the cabin sides. Mahogany and teak planks jointed together. (That bottle of wood glue in the picture has nothing to do with this - the cabin sides are glued with epoxy).

aftcabin after end

cabin after endcabin after end

 

PREPARING FOR THE MAINDECK

Setting up a set of teak stairs that were taken from the SS Olympia when it was being broken up. They will be enclosed in a stair well and this will be the main entrance to the boat's accommodation.

insideframe heads

 

The beams need to be faired in final preparation before laying the deck.

fairing deck beamsfairing deck beams