2012 - FIRST QUARTER

INTRODUCTION

2008 Q4 - Starting Out

2009 Q1 - Beam Shelves

2009 Q2 - Stern

2009 Q3 - Stern, Hog

2009 Q4 - Stern

2010 Q1 - Frames & Ribs

2010 Q2 - Frames & Ribs, Afterdeck

2010 Q3 - Hull, Afterdeck

2010 Q4 - Floors, Cabin Sides


2011 Q1 - Bilges, Engine Room

2011 Q2 - Deck Beams, Ports

2011 Q3 - Deck Beams, Cabin Aft

2011 Q4 - Maindeck

2012 Q1 - Maindeck, Foredeck

2012 Q2 - Foredeck, Electrics

MAIN DECK

The maindeck is laid. Now we have about 2000 holes to plug.

teak deck

main deckmain deck

main deckmain deck

 

PORT HOLES

Fitting the portholes, there will be a copper liner between the bronze inner and outer castings..

bronze portsinside

 

REPAIRS

Final repairs to the frames in the cabin area include two more laminated sections.

frame repairframe repair

-

Repairs under the wheelhouse. There was some rotted wood around here. New frames and beams in Iroko.

wheel housewheel house

wheel housewheel house

 

FOREDECK

All the foredeck beams need to be replaced, most of them were not original and many were rotted at the ends and sagging at the centre. The beam shelf is fine, probably because it is teak. The new beams are iroko, the knees are oak.

fore deckfore deck

fore deck beamsfore deck beams

 

Repairs made around the stem include a new oak breasthook to replace the cracked original. The original wrought iron reinforcement below this remains.

breasthookbreasthook