layed up

 

PREPARING FOR THE CABIN SIDES

More bearers to support the bulkheads and add strength to the hull, they are made of oak and iroko. Oak posts to support the bulkheads and cabin sides go in at the same time.

stengthening the hullstengthening the hull

cabinplanking

oakcabin sides

 

FOREDECK

Moving ahead, the foredeck is now stripped. The deck beams will need replacement but the beam shelves and planking around the bows are fine.

foredeckforedeck

 

BUILDING THE CABIN SIDES

oakcabin sides construction

-

The cabin sides are raised plank by plank, each laminated in two parts, the inner is utile and the outer is teak. The planks are fasten with bronze pocket bolts and oak 'biscuits', then fastened to the oak bulkhead frames with bronze screws.

cabin side constructioncabin side construction

cabin side constructioncabin side construction

cabin side constructioncabin side construction

-

Clamping a plank.

cabin sides clampingcabin sides clamping

-

Holes for the round portholes will be cut out later.

cabin sidescabin sides

cabin aftaft